60% OFF en Stock Limitado  Ver más

Enviar a
Quito, Pichincha
0
  • argentina
  • chile
  • colombia
  • españa
  • méxico
  • perú
  • estados unidos
  • internacional

Selecciona tu país

América

Europa

Resto del mundo

portada Construction Inspection Handbook: Quality Assurance/Quality Control (en Inglés)
Formato
Libro Físico
Editorial
Idioma
Inglés
N° páginas
773
Encuadernación
Tapa Blanda
Dimensiones
21.6x14x4 cm
Peso
0.89 kg.
ISBN13
9781475711936
N° edición
0003

Construction Inspection Handbook: Quality Assurance/Quality Control (en Inglés)

James J. O'Brien (Autor) · Springer · Tapa Blanda

Construction Inspection Handbook: Quality Assurance/Quality Control (en Inglés) - O'Brien, James J.

Libro Nuevo Importado
Envío: 16 a 23 días háb.
$ 280.74$ 140.37
-50%
Costos de importación incluídos en el precio ✅
Libro Nuevo

Quedan más de 100 unidades

$ 140.37
Llega entre el 15 Sep y el 28 Sep a Quito, Pichincha. Seleccionar ubicación

Reseña del libro "Construction Inspection Handbook: Quality Assurance/Quality Control (en Inglés)"

The inspection team must become familiar with the plans and the specifica- tions; they form the basis upon which the QC inspection is made. The in- spector must realize that errors and omissions will be discovered, and will have to be duly reported to management. Wherever an error or omission is substantial, it is appropriate to review it with the designer first to ensure that the error noted is valid. The QC inspection team is on the job to be objective, and to enforce the contract as written. When the contract does not suffice to cover the work conditions, then the Inspector should request the opportunity to prepare an appropriate clarification or change order to the contract. The question of whether a change order is to result in a credit to the owner or to the contractor is a matter of interpretation of the plans and specifications. The Inspector should exercise great care to avoid casual commitment or agreement with change items, and should first research a change or requirement in the plans and specifications to determine that it is not included in the contractual scope-either partially or completely. Next, the inspector should collaborate with the management team, receiving their agreement before making any commitments or carrying on any conclusive discussions with the contractor. From that point on, standard change order procedures, approvals, and doc- umentation should be followed.

Opiniones del libro

Preguntas frecuentes sobre el libro

Todos los libros de nuestro catálogo son Originales.
El libro está escrito en Inglés.
La encuadernación de esta edición es Tapa Blanda.

Preguntas y respuestas sobre el libro

¿Tienes una pregunta sobre el libro? Inicia sesión para poder agregar tu propia pregunta.

Opiniones sobre Buscalibre

Ver más opiniones de clientes