Compartir
Estimating Performance Time for Air Force Military Construction Projects (en Inglés)
Greg J. Hoffman
(Autor)
·
Biblioscholar
· Tapa Blanda
Estimating Performance Time for Air Force Military Construction Projects (en Inglés) - Hoffman, Greg J.
Libro Nuevo
Importado
Envío: 16 a 22 días háb.
$ 59.22$ 29.61
Costos de importación incluídos en el precio ✅
Reseña del libro "Estimating Performance Time for Air Force Military Construction Projects (en Inglés)"
The prediction of construction time performance is a problem of interest to both researchers and construction industry practitioners. This research seeks toidentify significant factors which may influence construction durations for Air Force Military Construction (MILCON) projects to establish a time predictionmodel. Data were collected for 856 MILCON projects completed between 1988 and 2004; this included both traditional facility and non-facility (e.g. airfieldpavements, utilities) projects. These data were analyzed using Bromilow's time-cost (BTC) model (1969) as well as multiple linear regression. Neither modelproduced acceptable results for non-facility projects; however, the multiple linear regression model was found to provide the most acceptable time predictionmodel for facility projects.As with the BTC model and previous research reported in the literature, there was a significant correlation between cost and duration. However, severalother factors were also identified that resulted in significantly lower than average construction durations.
- 0% (0)
- 0% (0)
- 0% (0)
- 0% (0)
- 0% (0)
Todos los libros de nuestro catálogo son Originales.
El libro está escrito en Inglés.
La encuadernación de esta edición es Tapa Blanda.
✓ Producto agregado correctamente al carro, Ir a Pagar.